Project: Aldergrove Recreation Centre Location: Langley, British Columbia General Contractor: Graham Construction Architect: HDR – CEI Structural Engineer: Krahn Engineering (Vancouver) Scope: Cast-in-place and Insulated Tilt-up Concrete. Reclaimed Timber at exterior stair towers. Year: 2017-2018