Project: Tritan Transportation EAC Location: 43959 Progress Way Chilliwack BC General Contractor: Gerry Ends Contracting (GEC) Architect: Keystone Architecture and Planning LTD Structural Engineer: Van Den Brink Huebert Engineering Scope: Supply and Installation of Concrete Precast Wall Panels.